We now have doors on the cabinets. We are still using the old stove, as well as the cabinet unit with the sink. I think they are waiting so they can replace the sink and install the new one within a minimal time frame.
They also removed the linoleum from the kitchen/dining area, revealing original hardwood floors.
1 comment:
Wow, the kitchen is really looking great! Is the contractor going to tear out the rest of the floors too?
Post a Comment